# x1025 — Product, progress, market and financing

Published by x1025. Updated 2026-11-06. All financial amounts are in US dollars.

This is the company's public account of its work and plans, prepared from its 31 October 2026 application, development demo, current send-ahead deck, expense and income model, and subsequent founder updates. Company progress and commercial discussions are founder-reported. External industry facts have linked sources. Targets, estimates and simulation results are identified separately from completed work. An application to Y Combinator does not imply acceptance, investment or endorsement.

## What is x1025 building, and for whom?

x1025 builds completely unmanned cargo ships, with no people onboard. Onboard autonomy operates the vessel, while mariners in a shore-based Remote Operations Center (ROC) supervise, communicate and handle exceptions across a connected fleet. The work spans navigation, cargo handling, machinery and maintenance. Autonomous navigation alone does not remove the need for people aboard.

The first product is Pratham, a supply vessel intended to deliver supplies to ships at anchor. The founders specify a 12-tonne cargo payload target for the smallest/test supply vessel; this is a design target, not a measured sea-trial result. The first intended buyers are existing supply-boat operators, starting with short, repetitive routes in San Francisco Bay. The company is pursuing an America-first strategy, with US-heavy spending assumptions. Both founders live in San Francisco, near customers, shipyards and robotics talent. A dock-access workspace in Vallejo has been explored; a secured facility is not reported here.

Pratham's design is shown with an empty deck, palletised cargo and a single 20ft container. These are three configurations of one vessel. Carrying a container does not mean the design requires a new port gantry crane. The central constraint is that adoption should require no changes to ports, cranes, other vessels or infrastructure outside the ship manager's control.

Dashak is the planned inland and coastal cargo-vessel class. Shatak is the planned ocean-going class. The deck places these later stages around 2029 and 2032 respectively, beyond the current round. These are ambitions, not committed delivery dates or available products.

## What problem does this solve?

Crews perform essential work, but living and working aboard exposes people to hazards and places limits on vessel size, staffing, scheduling and operating costs. x1025's aim is to move people ashore and make their expertise useful across a fleet. Lower operating constraints could make smaller routes viable, increase service frequency and support trade with islands and other underserved locations.

The economic thesis includes removing accommodation requirements, redesigning shipboard work, improving utilization and giving shore teams greater reach. Any cost or safety improvement still has to be demonstrated in actual operations. The company does not claim that moving people ashore removes all human error, eliminates the need for mariners, or guarantees safer operation.

External context:

- UNCTAD reports that more than 80% of international trade in goods by volume travels by sea. This is a volume share, not a share of global GDP or trade value. [UNCTAD, 2025](https://unctad.org/news/shipping-data-unctad-releases-new-seaborne-trade-statistics)
- CDC/NIOSH describes the US water transportation industry's occupational fatality rate as 4.7 times the rate for all US workers. This comparison concerns that US industry, not every maritime occupation worldwide. [CDC/NIOSH](https://www.cdc.gov/niosh/maritime/about/)
- Allianz analyzed almost 15,000 marine liability claims from 2011–2016 and identified human error as a primary factor in 75% of their value, representing over $1.6B of losses. This is a historical, multi-year insurance sample, not $1.6B per year or a current worldwide loss total. The deck's $20B annual liability claim is not supported by this source and is not used here. Autonomy's safety benefit still needs evidence. [Allianz analysis and source links](https://commercial.allianz.com/news-and-insights/expert-risk-articles/human-error-shipping-safety.html)
- The BIMCO/ICS Seafarer Workforce Report 2026 estimates a shortage of 39,100 STCW-certified officers in 2026 and a need for 113,735 additional officers by 2030. The same report estimates a surplus of ratings; it does not say every category of seafarer is in short supply. [BIMCO, June 2026](https://www.bimco.org/news-insights/press-media/press-releases/2026/0625-workforce-report/)

### How much do crews cost, and what is the denominator?

Crew costs can be around half or more of a vessel's **technical operating costs**, depending on vessel type, flag and crewing arrangements. They are not necessarily half of the complete cost of carrying freight. The evidence supports qualified examples, rather than a universal percentage:

| Evidence | Finding | Interpretation |
| --- | --- | --- |
| MARAD, September 2011 report using 2010 data | Crew accounted for about 35% of foreign-flag and 68% of US-flag vessel operating costs in its comparison | Historical support for the often-used roughly 35–70% range; not a 2026 global estimate. Some ship types were outside that range. |
| UK Chamber of Shipping evidence using Drewry's 2004/05 review | Around 30–35% for larger bulkers/tankers, 45–52% for smaller sizes, around 50% in typical coastal/short-sea sizes; some sectors up to 70% | Historical evidence of differences by ship size, segment and cost definition. |
| Moore Maritime Index 2025, financial year 2024, Panamax bulkers | Daily crew wages $2,783, provisions $232, other crew costs $395; total OPEX mean $6,730 | ($2,783 + $232 + $395) / $6,730 ≈ 50.7%, an illustrative ratio of category means. Moore warns these categories use independent samples, so this is not a measured fleet-wide crew share. |

Sources: [MARAD report, printed pp. 3–6](https://rosap.ntl.bts.gov/view/dot/42874/dot_42874_DS1.pdf), [Chamber of Shipping evidence and Drewry references](https://publications.parliament.uk/pa/cm200405/cmselect/cmtran/299/299we08.htm), [Moore 2025, pp. 5–6](https://moore-greece.gr/wp-content/uploads/sites/11/2025/11/MMI-Brochure-2025.pdf).

Technical operating costs typically include crew, stores/lubricants, routine repairs, insurance and management. Voyage costs such as propulsion fuel/bunkers, port charges and canal dues are a separate layer; capital costs, depreciation and financing are another. Removing a share of technical OPEX does not remove the same share of all-in transport cost. Nor does removing onboard positions eliminate shore staffing, maintenance or autonomy-system costs.

Who pays fuel depends on the contract. Under a typical time charter the owner supplies the ship and crew while the charterer pays bunkers and voyage expenses. Under a voyage charter the owner generally bears voyage costs and receives freight; in a bareboat charter operating and voyage responsibilities normally shift to the charterer. Freight/hire ultimately needs to cover the relevant costs, but fuel is not always paid by a different party. [HMRC: time charters](https://www.gov.uk/hmrc-internal-manuals/tonnage-tax-manual/ttm15120), [operator disclosure of charter cost responsibilities](https://www.sec.gov/Archives/edgar/data/1640043/000149315224015029/form20-f.htm).

## Why now?

High-bandwidth LEO connectivity makes live ship-to-shore monitoring and richer communication more practical than older low-bandwidth satellite links. Low-cost sensors, advances in AI and experience with autonomy in other domains create an opportunity to build better maritime systems. Starlink markets high-speed, low-latency maritime connectivity, but availability and performance vary. The vessel must still handle loss of connectivity safely. [Starlink maritime service](https://starlink.com/business/maritime)

IMO adopted its non-mandatory MASS Code in May 2026, with effect from 1 July 2026. It applies to cargo ships under SOLAS Chapter I, with governments invited to apply it as far as practicable to smaller autonomous ships. This provides a safety framework; it is not approval for Pratham or a blanket authorization to operate without crew. [IMO MSC 111](https://www.imo.org/en/mediacentre/meetingsummaries/pages/temporary-msc-111.aspx)

The 2026 US Maritime Action Plan calls for rebuilding maritime capacity and includes recommendations concerning robotic and autonomous systems and testing. These are policy directions, not a grant, contract or regulatory clearance for x1025. [US Maritime Action Plan](https://www.whitehouse.gov/wp-content/uploads/2026/02/Restoring-Americas-Maritime-Dominance.pdf)

## What has actually been built?

The development snapshot below is based on the October 2026 application and supplied demo, with commercial updates from the current deck. No later completed on-water milestone has been reported in this snapshot.

| Workstream | Completed or underway | What remains to be demonstrated |
| --- | --- | --- |
| Pratham vessel design | Concept design completed, stability analysis, structural finite-element analysis and computational fluid dynamics performed; earlier hull quotations reported, but no US shipyard quote for this design | US cost validation, construction and physical validation of the supply vessel |
| Shunya survey-boat development | Cameras and LiDAR installed on an existing boat; feeds integrated with GPS and sonar for ground control | On-water validation of the new obstacle-avoidance and survey-coverage work |
| Navigation development | Boat simulator calibrated against real operational logs; obstacle avoidance and survey-coverage replanning under development | Measured performance in real traffic, weather, communications failures and other intended operating conditions |
| Shore supervision | Fleet and vessel interface prototype built using simulated data | Integration with the supply vessel, measured operator workload and reliable exception handling |
| Crewless cargo transfer | Concept being developed around unchanged crane hooks and redesigned cargo nets/pallet handling | Physical autonomous transfers and repeatable customer workflows |
| Remote maintenance | Whole-vessel design and partner work aim to support inspection and intervention using onboard robots | Demonstrated interventions, reliability, safe fallback and maintenance economics |

Shunya is an existing survey boat used to develop navigation. It is not a completed Pratham. Its existing workflow follows manually drawn routes and may need manual intervention or retrieval when obstacles interrupt a mission. Work on Shunya provides a physical boat, real logs and a concrete customer problem while the larger supply-vessel system is built.

### Engineering stack and development method

Shunya uses ArduRover, a Raspberry Pi and a Blue Robotics Navigator controller. The development stack includes C++ and Python, MOOS-IvP, MAVLink and Gazebo simulations calibrated with real boat logs. Cameras, LiDAR, GPS and sonar are part of the current integration work. Jetson Orin NX and ROS 2 are planned for perception; model selection and obstacle avoidance remain under development. The team uses Starlink for ship-shore connectivity, FreeCAD/Python for vessel design and Codex for software development.

The broader approach starts with remote operation and automates tasks as evidence supports it. The founders plan to record mariners performing shipboard tasks and, in a parallel track, capture actions and outcomes while mariners operate robots remotely. Tasks would be validated individually before reducing remote intervention. The goal is fewer operator minutes per task and more vessels supervised per mariner. A proven staffing ratio or production training dataset is not claimed.

Planned work with Shane Marine and Four Seas Shipping connects this development to real shipboard operations. The founders report signed MoUs supporting prospective operational collaboration. The data-collection plan combines video, audio and equipment readings with records of tasks, actions and outcomes, to capture what mariners notice, how they diagnose problems and what resolves them. These multimodal recordings are intended to support world models: models of how shipboard equipment and its surroundings behave, including the effects of an action. The robotics roadmap uses that understanding to develop inspection, diagnosis and physical intervention during voyages.

Progress will be measured through successful task completion, recovery from faults and fewer minutes of human assistance. Collection and training remain planned work; the current materials do not establish an exclusive dataset, completed maintenance model or proven staffing ratio. Data rights and operating results will determine how much lasting advantage this approach creates.

### What the 1 minute 54 second development demo shows

The demo submitted with the application contains the following evidence. This text summary makes the content accessible without requiring video playback.

| Approximate time | Content | Interpretation |
| --- | --- | --- |
| 0:00–0:17 | Pratham digital model and cargo configurations | Design and intended use |
| 0:17–0:30 | Engineering report pages and powering/structural analysis figures | Computational engineering work |
| 0:35–1:02 | Survey boat, equipment installation and sensor discussion | Physical testbed and founder-described integration work |
| 1:02–1:24 | Recorded mission versus simulated replay, navigation scenarios | Simulation calibrated with vessel logs; not a new autonomous sea-trial result |
| 1:24–1:36 | Fleet and vessel views in the shore interface | Software prototype with simulated data |
| 1:36–1:42 | Cargo-transfer illustration | Concept under development |
| 1:42–1:54 | Planned customer demonstration and larger-vessel direction | Future milestones and ambition |

The demo does not establish a deployed unmanned cargo fleet, completed autonomous cargo transfer, class approval or a particular collision-avoidance success rate. Fleet counts shown in the interface are simulated.

## What traction is there?

- **Agreed paid development:** Bay Marine Services agreed to pay $15,000 for delivering autonomy on its survey boat Shunya, plus additional hardware. The founders now expect payment sooner than previously anticipated; no exact receipt date or collected amount is reported. This is agreed development income, not current recurring revenue.
- **Additional deployment opportunity:** the founders estimate another $10,000–15,000 from the Martinez refinery deployment, on top of the $15,000 autonomy-delivery fee. The deck targets this customer work from December 2026. Together, these represent $25,000–30,000 of agreed development fees plus expected deployment income, excluding hardware; the deployment portion remains an estimate, not a reported completed job, binding direct Martinez contract or cash receipt. Shunya and this deployment are outside the current Pratham fundraising estimate and are not netted against its cash requirement.
- **Written demand signal:** an ocean-fertilization project has said by email that it will need 30 autonomous supply vessels. x1025 is developing a proposal. This is an expression of demand, not 30 completed sales, binding purchase orders, a $30M contracted backlog or guaranteed revenue. The precise purchase conditions have not been published.
- **Operator interest:** supply-boat operators in Singapore and the San Francisco Bay Area have expressed interest in buying and operating the vessels once they are shown to work. That qualification matters.
- **Industry access:** the founders report meeting more than 100 maritime organizations and research groups, spending more than a week with Four Seas Shipping's founder, and four days embedded at Shane Marine. This supports customer discovery and operating insight; it is not a customer count.
- **Partner agreements:** the current deck reports signed MoUs with Diden Robotics, Shane Marine and Four Seas Shipping. These support prospective technology and operational collaboration. They do not establish exclusive rights, finished integrations or purchases. Earlier discussions also included Lookout camera technology and Vocadian audio technology; this brief does not assign either a confirmed current contract status.
- **Regulatory and local operating discussions:** repeat discussions with the US Coast Guard, San Francisco Marine Exchange and local bar pilots have informed the work. Discussions are not approvals or endorsements.

The 31 October application reported no product users and no revenue. Agreed survey-boat development and planned customer work are meaningful early commercial signals, but they are distinct from delivered Pratham vessels or a commercial supply fleet. An updated actual revenue figure has not been supplied for publication.

## What is the current timeline?

The founders' 5 November update supersedes the earlier undifferentiated Q3 2027 launch target:

1. Start the Pratham program after the fundraising round closes; build the prototype supply boat in approximately six months from that point.
2. Run external on-water trials with actual customers for a further three to six months.
3. Target general availability after those trials and the required technical, operating, regulatory and insurance work.

This describes approximately nine to twelve months **after the raise closes** to a targeted general-availability decision. Funding close is the start trigger; its calendar date has not been announced. The original workbook's November 2026 start is a model baseline, not evidence that this clock has started. Calendar milestones must be rebased to the actual funding close.

Shunya's November 2026 trial target and December 2026 customer-work target are separate from this Pratham timeline. Their completion has not yet been reported here.

The round aims to demonstrate shipboard cargo workflows and remote maintenance interventions, build operating and regulatory evidence, and validate paid demand and customer economics. The founders confirm **four early supply vessels as the base planning target, consistent with a range of three to five**. Four and three-to-five are not contradictory quantities. The workbook distinguishes orders from operational vessels (its endpoint references 3–5 orders and 2–3 operational vessels); the deck's four-delivery ambition is a further milestone, not proof of four booked orders or four fully financed builds. Supplier costs, customer milestone payments, trial gates and delivery phasing still need reconciliation. The public base target has not been increased beyond four.

## How will x1025 make money?

The planned business has three stages: sell autonomous commercial vessels, charge recurring shore-supervision fees, and eventually operate owned autonomous fleets earning freight revenue.

| Product | Target vessel selling price | Status |
| --- | --- | --- |
| Pratham supply vessel | $1 million | Development-stage target |
| Dashak inland/coastal vessel | Approximately $10 million | Future product target |
| Shatak ocean-going vessel | Approximately $40 million | Future product target |

These are target prices, not accepted customer quotations, current transaction prices or evidence of manufacturing margins.

The latest deck proposes a monthly shore-supervision fee equal to 25% of the onboard crew cost replaced **for autonomous vessels x1025 sells**. This is not the general price of ThinkingShips.ai, whose software offering and revenue forecast are separate. For the illustrative supply-boat case, two crew positions at $12,000 per person per month produce a $24,000 monthly baseline and a proposed $6,000 monthly supervision fee. The earlier vessel-supervision starting-fee proposal is superseded; contract scope and final pricing remain to be agreed.

### What does the $216,000 annual savings example mean?

| Annual item in the illustrative case | Amount |
| --- | ---: |
| Two crew positions × $12,000/month × 12 | $288,000 |
| Shore supervision at 25% of that baseline | $72,000 |
| Difference | $216,000 |

The example assumes a roughly $1M conventional boat and a $1M x1025 vessel. It compares the crew-cost allowance with a proposed supervision charge. It excludes fuel/energy, insurance changes, maintenance, connectivity, financing, depreciation, additional autonomy equipment, rescue/recovery, utilization and other operating differences. It is not a complete total-cost-of-ownership model, a proven savings claim or a customer payback calculation.

The $12,000 monthly allowance includes the company's assumed benefits/loading. BLS's May 2023 San Francisco–Oakland–Hayward figure for captains, mates and pilots was $119,550 in annual mean wages; it does not itself establish a $144,000 fully loaded annual cost for each of two identical positions. Crew composition, shifts and actual customer costs need validation. [BLS occupational wage data](https://www.bls.gov/oes/2023/may/oes535021.htm)

At the example fee, 100 continuously subscribed vessels would produce $7.2M in annualized supervision revenue. Selling 100 Prathams at the target vessel price would produce $100M of vessel sales. Vessel sales and one-off development fees are not ARR. The subscription calculation is illustrative and requires deployed, paying customers; it is not current recurring revenue.

## How large is the opportunity, and what is the growth plan?

There are three distinct opportunities: replacement/new vessel sales, recurring supervision of the installed autonomous fleet, and eventually freight from owned ships. The first serviceable market is existing supply-boat operators on suitable short routes. The calculations below show the scale of later expansion; they do not assume that x1025 can serve the entire global fleet today.

### Sourced fleet counts and transparent replacement scenarios

ANAVE's 2024/2025 report, using IHS Markit data at 1 January 2025, lists approximately **13,900 bulk carriers** and **17,600 general-cargo ships**. These are published rounded counts. General cargo includes coastal and ocean-going ships; it is not a count of all inland vessels or a count of vessels proven suitable for Dashak. The two categories are separate. [ANAVE, page 14](https://anave.es/wp-content/uploads/2025/06/MMTM2025_eng_web.pdf)

The formula is **fleet count × technically/commercially eligible fraction × assumed selling price ÷ replacement life**. At 100% eligibility, applying the company's $40M ocean-going and $10M inland/coastal target prices as broad proxies gives:

| Fleet benchmark and price assumption | 30-year replacement | 25-year replacement | 20-year replacement |
| --- | --- | --- | --- |
| ~13,900 world bulk carriers × $40M | $18.53B | $22.24B | $27.80B |
| ~17,600 world general-cargo ships (coastal and ocean-going) × $10M | $5.87B | $7.04B | $8.80B |
| Combined illustrative annual vessel sales (100% eligible; no supervision) | $24.40B | $29.28B | $36.60B |

The 20–30-year lives and uniform prices are company scenario assumptions, not observed market replacement rates or weighted shipbuilding prices. Vessels vary greatly in size, age and duty; not every ship in either category would fit the planned design. For example, 25% eligibility reduces the combined 25-year sales illustration from $29.28B to $7.32B annually. The calculation excludes growth, tankers, containerships, passenger vessels, tugs, unpowered barges and a separately counted inland fleet. It is a scoped opportunity illustration, not a new verified all-shipping TAM or near-term sales forecast.

### Recurring supervision, with a separate adoption assumption

Using the Panamax crew-cost proxy above: ($2,783 + $232 + $395) × 365 = **$1,244,650 per year**; 25% gives **$311,162.50 per subscribed vessel per year**. This is an illustrative sum of independently sampled cost means, not a quote or a representative cost for every bulker. The fee applies only to autonomous vessels sold by x1025. [Moore MMI 2025, page 5](https://moore-greece.gr/wp-content/uploads/sites/11/2025/11/MMI-Brochure-2025.pdf)

For the bulk-carrier population alone, with $40M per new ship and a 25-year replacement assumption:

| Hypothetically eligible share of the bulker fleet | Annual replacement sales at 25 years | Annual supervision after full eligible-fleet adoption | Combined steady-state illustration |
| --- | --- | --- | --- |
| 25% | $5.56B | $1.08B | $6.64B |
| 50% | $11.12B | $2.16B | $13.28B |
| 100% | $22.24B | $4.33B | $26.57B |

Supervision here assumes the entire eligible fleet has eventually adopted and pays for the service for a full year. It takes years to build that installed fleet; it does not arise from one year's replacement sales. At 100% hypothetical eligibility the recurring portion is about $4.33B annually, not x1025's current ARR. Actual company revenue also depends on market share, uptime, price, retention and operating approvals. No general-cargo supervision total is added because an appropriate crew-cost mix has not been established.

### The initial supply-boat segment

For each **1,000 hypothetical eligible Pratham-type boats**, a $1M price and 25-year replacement assumption imply $40M in annual vessel sales. At the illustrative $72,000 annual supervision fee, a fully converted installed fleet would add $72M, giving $112M per year in a mature scenario. This is a unit calculation, not a claim that the eligible fleet has 1,000 vessels.

At those same assumptions, the deck's $0.2–0.6B supply-boat estimate would require roughly **1,786–5,357 eligible boats**. A verified census of ship-supply launches and customer procurement budgets is still needed to establish that population. Offshore platform supply ships, tugs, harbour service craft and unpowered barges should not all be counted as interchangeable Pratham buyers.

The deck's approximately $18B inland/coastal, $57B ocean-going and $75B combined figures remain provisional company estimates; the evidence above does not validate that exact segmentation or total. Rather than imply it does, this context provides independently reproducible, narrower calculations and the assumptions needed to expand them. Regional inland fleet sources also combine powered craft and barges; they cannot be multiplied indiscriminately by a full-vessel price. [CCNR fleet data and definitions](https://inland-navigation-market.org/annees/2025-en/?lang=en). The [market inputs JSON](https://x1025.com/market-analysis.json) records the sources and numerical assumptions used here.

### Freight: a separate measured industry reference

UNCTAD reports **$487B of maritime freight transport service exports in 2025**, published on 8 June 2026. That supports describing an approximately half-trillion-dollar international freight-services industry. It is not the value of the goods carried, not a census of all domestic plus international freight revenue, and not the company's immediately addressable market. This replaces the unsupported use of "$500B+" as a precisely verified current figure. Freight revenue must not be added to vessel sales and supervision as a single serviceable market: these sit at different points in the value chain. [UNCTAD ocean trade data](https://unctad.org/news/ocean-services-lead-trade-opening-new-opportunities-developing-economies)

The founders' revenue ambitions are $100M annually by 2030 and $1B annually by 2035. For scale, 100 Prathams sold in a year at $1M each would generate $100M of vessel revenue; 25 Shataks at $40M each would generate $1B. This is scenario arithmetic, not a production forecast or proof of demand. The company ultimately intends to run its own fleets and aspires to become the world's largest shipping company. Manufacturing capacity, fleet financing and execution must develop to support that ambition.

## How is x1025 different from competitors?

x1025's competitive strategy centres on two advantages: **serving existing ports without requiring new infrastructure**, and **performing physical maintenance during a voyage using onboard robotics**. Together, they address two barriers to making unmanned cargo shipping widely useful: the effort needed to open another route, and the work needed to keep a ship operating far from shore.

### Existing infrastructure: more routes, fewer dependencies

A ship should not need a port to rebuild around it. x1025 designs around existing ports, cranes and other vessels. Changes belong aboard our ships and in equipment under the ship manager's control.

The cargo-handling concept makes this practical: redesigned cargo nets hold their lifting eyes open so an existing crane hook can collect them without someone aboard attaching them. The crane stays the same.

The commercial advantage we are building is expansion centred on delivering vessels, without requiring a separate infrastructure project at every destination. This targets lower adoption costs, fewer external dependencies and more routes that can become commercially viable. Compatibility will be established for the vessel's intended operating conditions and cargo workflows.

Yara Birkeland's published project includes shore infrastructure for automated mooring, charging, loading and unloading; Kongsberg's ASKO announcement also includes dedicated port infrastructure. x1025 is designing for operators who need unmanned vessels to fit their existing operations. This comparison concerns those cargo projects, rather than a requirement of every Kongsberg or Massterly solution. [Massterly projects](https://www.massterly.com/projects), [Kongsberg's ASKO announcement](https://www.kongsbergmaritime.com/news-and-events/news-archive/2020/zero-emission-autonomous-vessels/)

### Physical maintenance during voyages: ships that can do the work

Removing the crew requires more than moving the bridge ashore. Ships need inspection, machinery care and physical intervention while they are underway. x1025 makes that work a core part of the autonomy roadmap, combining onboard robotics, models of equipment behaviour and shore expertise.

The advantage we are building is the ability to handle more of those tasks aboard the vessel. It is central to our path from short supply runs to larger cargo ships and longer voyages. Planned operational data collection with Shane Marine and Four Seas Shipping grounds this work in the tasks mariners perform; the engineering section above explains the collection, modelling and validation approach.

Massterly's published approach emphasises maintenance primarily in port, with fewer moving parts, alongside engineering supervision from shore. Its March 2026 Chief-to-Shore update reports one ROC technician supervising three vessels using alarms, camera feeds and vessel information. x1025's roadmap adds onboard robotic inspection and physical intervention during voyages. Remote engineering supervision and robots acting on equipment solve different parts of the problem; this is a distinction in our development focus, not a claim that competitors cannot pursue it. [Massterly's approach](https://www.massterly.com/what-we-do), [Chief-to-Shore update, March 2026](https://www.massterly.com/archives/2026/3/4/shepherding-the-fleet-chieftoshore-project-enters-a-new-phase)

### A practical route from supply boats to ocean-going cargo ships

The strategy starts with Pratham, a 12-tonne supply-vessel design for short, repetitive routes and existing supply-boat operators. These runs provide a focused setting to prove useful service, work with customers and learn from operations. x1025 integrates established technology where it works and concentrates development on the missing capabilities. Vessel design, operational data and task-by-task validation support the progression toward larger ships and longer voyages.

The founders combine firsthand shipping experience with AI, robotics and technical team-building. That combination connects vessel design to customer workflows and the physical work aboard a ship; their backgrounds are detailed below.

Pratham's infrastructure compatibility and onboard robotic maintenance are capabilities under development; their performance and commercial benefits will be established through testing and customer operations, with current evidence recorded in "What has actually been built?" above.

### Competitor capabilities and supporting evidence

The competitive landscape includes maritime technology companies such as Kongsberg Maritime, ABB, Samsung and HD Hyundai; perception and operational-assistance providers such as Orca AI, ShipIn, Captain's Eye, MarineAI and SafeNav; and autonomous-vessel companies including Sea Machines, Saronic and Blue Water Autonomy. Massterly is the Kongsberg Maritime–Wilhelmsen joint venture providing autonomous-vessel services and operations; Yara is a customer and vessel owner. These categories overlap and are not a capability ranking. [Massterly's role](https://www.massterly.com/what-we-do)

| Example | Published evidence | Fair comparison |
| --- | --- | --- |
| Saronic Marauder | Manufacturer specifies 150 metric tonnes of payload, with container configurations | A larger published payload than Pratham's initial design target. Vessel specifications and demonstrated commercial cargo operations are separate measures. [Saronic vessel specifications](https://www.saronic.com/vessels) |
| Yara Birkeland / Massterly | Yara specifies 120 TEU capacity and 3,200 tonnes deadweight; Massterly's March 2026 update describes engineering supervision from shore with bridge teams still aboard Yara and the ASKO vessels | An established cargo project with substantial capacity and staged autonomy. Deadweight includes more than cargo; TEU measures container capacity. Its infrastructure model and approach to physical maintenance are the relevant comparisons here. [Yara's operating account](https://www.yara.com/knowledge-grows/yara-birkeland-two-years-on/), [Massterly's March 2026 update](https://www.massterly.com/archives/2026/3/4/shepherding-the-fleet-chieftoshore-project-enters-a-new-phase) |
| Blue Water Autonomy Liberty / A-CHENG | Manufacturer describes ocean-crossing endurance, six 40ft containers, engine-room autonomy and modular machinery designed for extended unmanned operation | An approach to long voyages and machinery autonomy that uses modular equipment. Swapping engine modules in port and x1025's intended onboard robotic repairs during a voyage address maintenance differently; performance comparisons require operating evidence. [Liberty](https://www.blw.ai/libertyclass), [engineering and maintenance approach](https://www.blw.ai/technology) |

Sea Machines also serves commercial shipping. [Sea Machines shipping](https://sea-machines.com/why-sea-machines/industries/shipping/). x1025's position combines infrastructure compatibility, physical work aboard the vessel and a commercial adoption path beginning with supply boats. The comparison rests on how these capabilities serve customers and develop together.

No exclusive dataset or granted x1025 patents are reported in this context. Founders' prior research and patents are separate from company-owned intellectual property.

## Who is building it?

Hash Harshvardhan is CEO and leads customer discovery, adoption and regulatory work. His background includes eight years at sea, managing 22 ships from shore, shipbuilding, repairs and marine insurance. He holds an MIT MEng. The current deck also describes work building Gopuff's middle-mile logistics and leading automated warehouse design.

Avikalp Kumar Gupta is CTO and leads vessel design, autonomy software, robotics and product engineering. He studied computer science at IIT Kanpur, was a Microsoft Research fellow, and has worked in applied AI, computer vision and Physical AI, including Fresh Gravity. The deck describes him as a former Head of AI at a Series-B startup and a two-time founder. His experience includes GetMega's real-time engine and AI systems serving approximately 30,000 daily active users in prior work; these are not x1025 users.

Together, their experience connects x1025's two core engineering challenges: fitting unmanned ships into real port and customer operations, and giving onboard systems the ability to inspect and act on machinery. Hash's operating, shipbuilding and repair background informs the tasks and constraints; Avikalp's AI and engineering background connects those needs to models, robotics and integrated vessel design. The planned work with operators provides a practical setting for that collaboration.

The founders met through On Deck in February 2026, first met in person at Posidonia in Athens in June, and completed a work trial. They committed to pursuing this vision together in the **third week of July 2026**. The current approach took shape in **mid-August 2026**, when they decided to build their own ships rather than make retrofits the core business. Both founders work full-time on x1025. Hash had been working in this space since January 2026. As of the application, the founders had written the code and created the designs, with advisors reviewing their work.

Immediate hiring priorities are field robotics and naval architecture. The deck says prospective hires are waiting to join; it does not give signed-offer counts or confirmed start dates. Wider opportunities include mechanical/mechatronics and electrical engineering. The founders report no known blanket constraint on hiring exceptional people: they intend to find the best, most aligned talent and work out the right arrangement with each person. No fixed location restriction, visa policy or compensation package should be inferred; arrangements remain individual discussions. The [company brief](https://x1025.com/company.md) and [founder background](https://x1025.com/founders.md) describe the culture, working principles and people in more detail.

## Corporate structure and fundraising

x1025, Inc. is a Delaware C corporation. The founders confirm the current ownership allocation as **45% Hash, 45% Avikalp and 10% reserved for ESOPs**. The reserved pool is not a claim that all options have been granted. Both founders work full-time. This is the founders' reported allocation, not an independently audited cap table.

The company is seeking an $8M pre-seed round. The October application reported no prior investment. No completed round, current cash balance, debt balance, valuation, SAFE cap, discount or other investment terms are reported in this snapshot. The ask is not money already raised.

The intended outcomes are an integrated supply-vessel prototype, customer trials, cargo and remote-maintenance demonstrations, progress on the operating/approval pathway, and evidence of paid demand and customer economics. Larger vessel classes follow later. The current public plan does not promise that a particular number of delivered commercial vessels is fully financed by this round.

## How will the money be used?

The detailed financial baseline is the founders' 18-month expense and income workbook, using the **High cost case and US Heavy geography**, covering November 2026 through April 2028. The saved workbook selector was Medium; the figures below were recomputed from the High input column using the workbook's US multipliers and formulas. They do not use the saved Medium totals.

| 18-month planning measure | USD |
| --- | --- |
| Operating expenses | $4,311,450 |
| Vessel and program expenses | $2,837,500 |
| Total planned gross cash uses | $7,148,950 |
| Forecast ThinkingShips cash income | $1,982,500 |
| Net cash uses with that forecast income | $5,166,450 |
| Peak cumulative external funding need with forecast income and zero opening cash | $5,166,450 |
| Fundraising target, not proceeds received | $8,000,000 |
| Headroom against the target before any income | $851,050 |

The gross spending requirement is the useful starting point when discussing the raise. Forecast income reduces modeled net cash use but is not secured financing. The model assumes the same-month collection of ThinkingShips MRR and excludes supply-vessel sale/deposit cash receipts. The founders clarify that **Shunya is outside the current fundraising estimate**. Its $15,000 delivery fee and additional expected $10,000–15,000 Martinez deployment income are not counted as financing for this budget. No forecast receipt is counted as actual revenue.

### Detailed spending allocations

| Category | 18-month planned spend |
| --- | --- |
| Founder compensation (2 founders) | $594,000 |
| Core technical payroll - early | $799,425 |
| Core technical payroll - scaled | $1,088,587.50 |
| GTM / sales & marketing | $287,100 |
| EA / operations support | $164,937.50 |
| Partnerships / regulatory / legal | $461,100 |
| Cloud / AI / software | $273,000 |
| Travel / customer development | $415,800 |
| Insurance / accounting / G&A | $227,500 |
| Miniature vessel fabrication & tests | $112,500 |
| Naval architecture / ship design | $187,500 |
| Full-scale 12 m vessel fabrication | $562,500 |
| Autonomy sensors / compute / comms | $275,000 |
| ROC equipment & integration | $125,000 |
| Full-scale testing / rework | $312,500 |
| Class / regulatory / certification | $250,000 |
| Gen 1 manufacturing / delivery working capital | $375,000 |
| Gen 1 field iteration / support | $187,500 |
| Gen 2 design / virtual R&D | $275,000 |
| Gen 2 miniature prototypes / tests | $175,000 |
| Total | $7,148,950 |

Payroll uses a 1.65× US multiplier. GTM, operations support and partnership/regulatory/legal activity use 1.45×. Travel, G&A and cloud/software use 1.4×. Physical vessel/program allowances use 1.25×. These are model assumptions, not market-price guarantees.

The founders' combined High-case base input is $20,000 per month before the US payroll multiplier, resulting in a combined modeled $33,000 per month and $594,000 over 18 months. This is a budget allowance, not a statement of current paid salaries or candidate compensation. Technical, commercial and support expenses are phased rather than all starting at their full rate on day one.

The $562,500 full-scale fabrication line is a prototype planning allowance. It is not a supplier quote, total per-vessel cost or a basis for subtracting from the $1M selling price to claim a margin. Sensors, design, testing, integration, labor and other costs have separate lines. Regulatory and certification spending is especially uncertain. Gen 1 delivery working capital anticipates that customer milestone payments may eventually offset cash needs, but those payments are not currently modeled as receipts.

### Why raise $8M if the original gross budget is $7.15M?

The founder now expects that a US-built hull could cost around **$1M**, but has not received a US shipyard quotation for this specific design. That is a planning hunch, roughly $500,000 above the present allowance, and one reason for the $8M fundraising target. The original workbook has not been silently changed. For transparency, holding every other expense fixed:

| Hull-cost sensitivity (other expenses unchanged) | Gross cash uses | Remaining headroom against $8M |
| --- | --- | --- |
| Original workbook, no income | $7,148,950 | $851,050 |
| $1,000,000 unquoted hull replaces $562,500 allowance, no income | $7,586,450 | $413,550 |
| Approximate $500,000 additional cost, no income | $7,648,950 | $351,050 |

The exact replacement calculation adds $437,500, while the founder's rounded $500,000 contingency leaves $351,050. Neither case assumes income. This explains the buffer, but does not certify it as sufficient. The scope of a hull-only quotation must be reconciled with the workbook's fabrication line to avoid double-counting or omitting equipment. At a $1M hull estimate, the current $1M complete-vessel target selling price does not yet establish a viable production margin; prototype versus repeat-production costs, build geography and pricing must be resolved before claiming profitable unit economics.

The latest six-month prototype target has not yet been incorporated into the workbook's monthly spending schedule. The original monthly baseline is provided below for transparency; it must be rebased to fundraising close and rephased for the accelerated program. It is not a fixed commitment to spend from November 2026. Category totals may also change when supplier quotations, the four-vessel base plan and trial requirements are costed in detail.

### Monthly cash plan in the original workbook schedule

| Month | Planned spend | Forecast cash income | Net cash use |
| --- | --- | --- | --- |
| 2026-11 | $131,942.50 | $0 | $131,942.50 |
| 2026-12 | $168,715 | $2,500 | $166,215 |
| 2027-01 | $232,325 | $5,000 | $227,325 |
| 2027-02 | $215,797.50 | $7,500 | $208,297.50 |
| 2027-03 | $264,207.50 | $15,000 | $249,207.50 |
| 2027-04 | $296,930 | $22,500 | $274,430 |
| 2027-05 | $327,757.50 | $30,000 | $297,757.50 |
| 2027-06 | $389,100 | $47,916.67 | $341,183.33 |
| 2027-07 | $387,362.50 | $65,833.33 | $321,529.17 |
| 2027-08 | $457,962.50 | $83,750 | $374,212.50 |
| 2027-09 | $466,550 | $101,666.67 | $364,883.33 |
| 2027-10 | $538,025 | $119,583.33 | $418,441.67 |
| 2027-11 | $546,525 | $137,500 | $409,025 |
| 2027-12 | $581,025 | $181,250 | $399,775 |
| 2028-01 | $602,900 | $225,000 | $377,900 |
| 2028-02 | $491,525 | $268,750 | $222,775 |
| 2028-03 | $537,775 | $312,500 | $225,275 |
| 2028-04 | $512,525 | $356,250 | $156,275 |
| Total | $7,148,950 | $1,982,500 | $5,166,450 |

The 18-month total includes months numbered 0–17 in the workbook. Its M18 milestone is May 2028, shown separately as an endpoint snapshot, and is outside the November 2026–April 2028 cash total. Adding the M18 income again would overstate income over this period.

### What income assumptions reduce the modeled funding need?

ThinkingShips is software for shipowners and managers running fleets today, distinct from Pratham's future vessel sales and shore-supervision subscriptions. Its general pricing is not the 25%-of-replaced-crew-cost rule, which applies only to autonomous vessels sold by x1025. The funding model assumes growth in this software business. It must not be described as an existing paid Pratham fleet.

| Elapsed month | Paying TS customers | Live paid vessels on TS | Contracted/committed vessels on TS | Target MRR | Target annualized run rate |
| --- | --- | --- | --- | --- | --- |
| M3 | 2.5 | 7.5 | 22.5 | $7,500 | $90,000 |
| M6 | 6 | 27.5 | 75 | $30,000 | $360,000 |
| M12 | 17.5 | 125 | 275 | $137,500 | $1,650,000 |
| M18 | 35 | 325 | 650 | $400,000 | $4,800,000 |

These are base forecast milestones, using midpoints of target ranges. Fractional customer and vessel counts are planning averages, not actual customers or half-built boats. The income model interpolates monthly MRR between milestones and assumes collection in the same month. The M18 target of $400,000 MRR implies a $4.8M annualized subscription run rate if achieved; neither is current revenue.

The workbook has zero inputs for vessel sale receipts, deposit percentage and delivery/milestone receipts. That excludes vessel income from the cash forecast; it does not mean vessels are free. It also does not validate a zero-cost production plan. No gross-margin schedule, customer acquisition cost, subscription churn evidence or financing plan for an owned freight fleet is supplied.

### What happens if revenue is slower or costs rise?

| Scenario | External cash required, zero opening cash | Headroom / (shortfall) against $8M |
| --- | --- | --- |
| Baseline spend, forecast ThinkingShips income | $5,166,450 | $2,833,550 |
| Baseline spend, half the forecast income | $6,157,700 | $1,842,300 |
| Baseline spend, no income | $7,148,950 | $851,050 |
| Spending 10% above baseline, no income | $7,863,845 | $136,155 |
| Spending 20% above baseline, no income | $8,578,740 | ($578,740) |

These are simple sensitivities holding the original spend schedule and other assumptions fixed. They do not model a delay, financing costs or changed staffing. The $8M raise target would cover the stated baseline gross spend with a limited buffer if fully raised, but that is not a claim of cash already available or guaranteed runway. A revised schedule and actual cash balance are needed for a current runway calculation.

The spending categories in the working deck have not been mapped and reconciled to these detailed workbook categories. This public plan uses the workbook as the numerical baseline. The unallocated gap between the $8M target and modeled spend is headroom, not an additional expense already included in the workbook.

The [funding-plan JSON](https://x1025.com/funding-plan.json) provides the same totals, category inputs, monthly category amounts, geography multipliers and forecast milestones in structured form.

## What remains unresolved for an investment decision?

- Measured on-water autonomy results, operating limits and trial acceptance criteria, including behavior under degraded connectivity and sensor failures.
- Repeatable physical cargo transfer and maintenance interventions, plus how many vessels a shore team can safely supervise.
- The specific approval, class and insurance pathway for the first route and vessel. Engagement is underway, but approval is not reported.
- A complete customer route-economics comparison covering utilization, energy, maintenance, insurance, connectivity, staffing and financing.
- Supplier-backed production costs, delivery capacity, warranties/support obligations and a working-capital plan tied to customer payments.
- A rephased budget from fundraising close for the six-month prototype and subsequent customer trials, with supplier-backed costs and delivery milestones for the four-vessel base target.
- Verified current revenue, payment status and financial position, plus evidence behind ThinkingShips' forecast adoption.
- A verified census of the first eligible supply-boat market, design-specific eligibility and customer economics for larger classes, and conversion of stated interest into signed purchase terms. The sourced fleet scenarios above establish scale under explicit assumptions, not those procurement decisions.

The [Pratham enquiry page](https://x1025.com/pratham/enquire) reaches the founders for operating requirements and commercial discussion. Investors and prospective colleagues can also contact founders@x1025.com. The [live Logbook](https://x1025.beehiiv.com/) provides ongoing company writing; posts are not copied into a frozen article archive here.

## Source dates and interpretation

- Company application: submitted 31 October 2026, as reported by the founders.
- Development demo: 1 minute 54 seconds, supplied with the application and reviewed alongside its narration and frames.
- Send-ahead pitch deck v2.0: work in progress, supplied 5 November 2026. Current commercial and proposed-pricing descriptions above use this deck where they supersede earlier drafts.
- Expense and income model v4: High cost case, US Heavy geography, recomputed and checked against the source formulas on 5 November 2026. Original monthly phasing is retained and identified as such.
- Founder updates, 5 November 2026: funding-close timeline, Shunya outside the raise estimate, four-vessel base plan, unquoted US hull cost, separate Martinez income, vessel-specific supervision pricing, 12-tonne initial design target, ownership, full-time commitment, July/August founding decisions and approach to hiring.
- Competitive positioning update, 6 November 2026: infrastructure compatibility, onboard physical maintenance and the planned multimodal data programme with Shane Marine and Four Seas Shipping. The comparison uses linked project descriptions and Massterly's March 2026 Chief-to-Shore account; it does not report a new completed x1025 technical milestone.
- External research checked 5 November 2026: source links beside industry statistics, fleet calculations, charter cost definitions and competitor descriptions. Historical data years and scenario assumptions are explicit; manufacturer specifications are not independently demonstrated performance.

Older source statements that conflict with the current account are not additional current commitments. Unpublished or unresolved values remain unknown; forecasts, unsigned interest, demonstrations and policy activity are not substituted for actual revenue, orders, completed capability or approval.